• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Jack

    Log entry time 08:06:22 on April 03, 2009

    Entry number 266639

    keyword=Left Detector Stack is back in

    Scot and I finished with the detector work. The stack is back in the Shield House. Scot put the RICH under a nitrogen purge, UHP grade nitrogen. At this time the RICH will be stored in the hall. The Left Detector Stack is VDCs, S1, long Gas Cherenkov (using the Rutgers extension box), S2m, Carbon Doors (in the open positions), SC3 (unused, unpowered), SC4(unused, unpowered), Pion Rejector.