User name V. Sulkosky/B. Zhao
Log entry time 22:43:25 on April 20, 2009
Entry number 267223
keyword=R-HRS Fast Clock Ready
I have connected the fast clock that Bryan is sending from the BigBite
Weldment to the R-HRS sub-systems. The clock is plugged into the 17th
channel (starting from 1) of the normalization scalers, and I have updated
the scaler map file.
I also verified and reconnected the cables to the scalers in the two
fastbus crates on the R-HRS: ROC 1 and 2 for the synchronization. I can
show Joe were to get a copy for the Happex crate for the Lumi insertion.
A copy of this log entry has been emailed to: rom,jiang,moffit,jkatich,zhaobo