    0:00 take over the shift, waiting for beam.
    0:40 call MCC to request 5 uA beam for a harp scan
    0:50 the harp scan is done, looks good, then start to take optics runs.
    (1) Delta=+3.0% P_HRS=1.275
    L-arm run: 1454, 1455
    R-arm run: 20630, 20361

    02:00 since T1 and T3 rate is about 200 Hz, we decide to increase beam current to 12 uA and take 2 runs, around 1M events, for each arm

    02:30 change momentum to 1.238 for both arms
    (2) Delta=0.0%, P_HRS=1.238
    L-arm runs: 1456, 1457, 1458
    R-arm runs: 20632, 20633, 20634

    02:55 momentum in dipole of RHRS is 1.2348, not 1.238 we expect. Adjust the current a little to get momentum = 1.2381.
    04:00 change momentum to 1.200. Page RC to prepare for sieve slits change.
    05:20 Brad is here. call MCC to ask for a escort controlled access to adjust sieve slits.
    05:40 slits are adjusted. Follow the start procedure to get the beam back, The real raster size is 3X4 mm from MCC 6X5. Ff ask for 8X5, the real size is around 4X4 mm, see seperate log engry.

    06:30 start tuning beam on 3He target. However, we have a problem about 3He polarization. Brad, RC, decided to take some runs on N2 reference cell.
    07:30 start to take data on vacuum reference cell.