User name Ole Hansen
Log entry time 15:57:38 on April27,2009
Entry number 269161
keyword=Day Shift Summary
Finished 3He elastic calibration runs at p=1.2205 (2hrs, 1 hr with half-wave plate OUT, 1 hr with IN).
Accelerator down since 11am for North Linac work. Took opportunistic access to work on DAQ tests and troubleshooting (see halog entries).
Beam became available at 15:35pm, but we are still in access at the end of the shift.