    Finished 3He elastic calibration runs at p=1.2205 (2hrs, 1 hr with half-wave plate OUT, 1 hr with IN).
    Accelerator down since 11am for North Linac work. Took opportunistic access to work on DAQ tests and troubleshooting (see halog entries).
    Beam became available at 15:35pm, but we are still in access at the end of the shift.