Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name X. Jiang
Log entry time 22:56:26 on April27,2009
Entry number 269293
keyword=Ay production run basic conditions
one pass A_y production run basic conditions.
For one-pass Ay production:
1. Both arm at P=1.17590, 17 degree, never moved.
2. 6 uA beam, rastered, 8*5 MCC setting, 4mm*4mm in Hall A.
3. Left arm DAQ, ps3=7 only, no other triggers.
Sacler rate, TS3=21 kHz. 5M events each run for 1/2 hour.
Coda rate: 3kHz
Watch out for dead time.
4. Right arm DAQ, ps1=7 only, no other triggers.
Scaler rate, TS1=18 kHz. 4.25 M events each run, for 1/2 hour.
Coda rate: 2.4 kHz
5. Make sure Happex DAQ is already running.
Start run by hit Right-DAQ first, then Left-DAQ,
When end run, hit Left-DAQ first, then Right-DAQ.
6. Restart Happex-DAQ every 4h, while two-arm DAQ stopped.
7. Watch out for Lumi screen in the back room (expert).
8. Replay for detector checks.
9. Watch out for target spin-flip.