    Log entry time 08:02:58 on April30,2009

    Entry number 269926

    keyword=Owl Shift Summary (04/30/09)


    Owl shift summary: Miha Mihovilovic (SL), Peter Bradshaw (TO)
    Eli Piasetzky (3rd)
    ===================================================================

    EVENTS

    00:10 Called MCC and asked for 2uA beam with raster (2x2mm)
    We don't know the correct MCC units so we asked for
    tested following MCC units (3.25 x 3.25MCC)

    00:20 Called MCC and asled for 2uA beam with raster (6x6)mm.
    In our calculation this is (9.75x9.75) in MCC units.



    00:30 T3 rates for beam with different raster sizes match
    within 10%. Called MCC and asked for production beam
    i.e. 6uA with raster (4x4mm) = (6.5 x 6.5 MCC).


    00:42 MCC has problems with beam. It keeps tripping.

    00:44 The ND HV channel L6.3 tripped. Turned the whole
    slot off and on again. It looks normal again.

    00:50 Starting a test run before production in order to
    check raster (4x4), to test rates and to make
    a lumi HV calibration (Xiaoyan).

    01:05 HAPPEX DAQ crashed. Experts are trying to resolve the
    problem.

    01:08 The ND HV channel L6.4 tripped. Turned the whole
    slot off and on again. It looks normal again.

    01:25 Experts are still having problems with the HAPPEX DAQ.
    They report that the ROC 28 has died and that they can
    not reboot it. I have paged Peter (RC) and he suggested
    to page Bryan. We are not taking any production data so
    far.

    02:00 Bryan solved the problem with the HAPPEX DAQ and made it
    running again.

    02:37 Experts are adjusting the HV for the LUMI. They need to
    change the HV for all of the channels since we went from
    1st pass beam to 3rd pass beam.

    02:55 Experts have set the HV for the LUMI. Started a new HAPPEX
    run #31294.

    02:58 Start taking production data.

    06:15 Almost at the end og the run #1689 the ROC3 crashed. We
    rebooted it. Then we have restarted coda and continued
    with the data taking.

    06:45 MCC called and informed us that they will take a beam away
    for a few minutes because they need to make an optics check.

    07:00 When the beam came back after the OPICS studies we have
    observed that the beam current was smaller (5.2 uA) than
    desired. I have called MCC and he told me that they have
    some problems at the injector and that the beam current
    will be slowly dropping until injector people come in and
    fix the problem. Run numbers of runs taken during this
    time are: #1691 and #20584.

    07:09 We started new HAPPEX run : #31295

    07:42 MCC called and said that they will take a beam away so that
    they can move the spot.

    RUNS
    ----

    LEFT HRS:
    ==========================

    Runs #1681 - #1684 Spot++ checks
    Run #1685 productions settings but without LUMI and HAPPEX.
    (Used for the calibration of LUMI HV.)
    Runs #1686 - #1691 Production runs



    RIGHT HRS:
    ==========================

    Runs #20574 - #20577 Spot++ checks
    Run #20578 productions settings but without LUMI and HAPPEX.
    (Used for the calibration of LUMI HV.)
    Runs #20579 - #20584 Production runs