• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name miham

    Log entry time 18:27:45 on April30,2009

    Entry number 270012

    keyword=ND HV trips

    There were many HV trips (various channels)in the ND during
    the calibration of the beam (raster check etc.) I have turned
    the ND off until they have finished the calibration and turned
    the ND back on when they were ready for the production.


    FIGURE 1