Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name R. Lindgren
Log entry time 17:34:43 on May 9,2009
Entry number 272149
keyword=Day Shift Summary
8:00 Day Shift starting with Production running
Workers
R. Lindgren SL
A. Deur TO
M Meziane 3rd
Runs in Progress 2014 20931
Happex started
Miha arried to start DE/E Check
9:00 LHRS DAQ crashed when BB Wire Chamber High Voltage turned on.
Tried rebooting and it still failed
Problem is with BB Trigger Supervisor
Tried to reboot using web
Still fails
Calling Bryan for help.
9:45 After turning BB Wire Chamber HV off and Scintillators HV off
LHRS DAQ started working again. Now in production running.
Beam position BPMA and BPMB y is at 2.9 NOT 2.0 as on white board
Run Coordinator says its ok.
Runs 2015 to 2024 and Runs 20932 to 20937 Junk Runs fixing DAQ
9:45 Start Runs 2025 20938
DAQ is now working
Mask target
Move to 3He
Take 2 ua beam Raster size 4 x 4 start DAQ Runs 2034 and 20944 DAQ ok
Take 2 ua beam Raster size 6 x 6 start DAQ Runs 2035 and 20945 DAQ ok
Request MCC to increase beam from 2 to 5.5 ua and reduce raster
to 4 x 4
Raster problem caused by MCC See Halog
Checked rates for different raster sizes
T3 T1 Size
900 730 4 x 4
930 720 6 x 6
908 770 4 x 4
Set to 4 x 4
Increase beam to 5.5 ua
DAQ okay
Turn high Voltage on HAND
Back to production running
11:55 Start Runs 2039 20949
13:00 Noticed VDC high voltage is down on R-HRS Bottom VDC
Continue running LHS while trying to fix VDC voltage
Voltage failed during Run 20946
It might have happened at the beginning of the run when raster went crazy in the y direction due to error by MCC.
Bogdan in Hall trying to debug the problem with the VDC high voltage.
Wery little production running due to DAQ problems and R-HRS VDC high voltage problem. Continuing to debug problem.
End of Day shift