Saturday, May 9, 2009
|
ABU |
BANU |
BNA |
Owl |
6.21 |
1.22 |
0.58 |
Day |
2.38 |
2.03 |
3.59 |
Swing |
4.04 |
1.39 |
2.55 |
Total |
14.69 |
2.35 |
6.93 |
· 00:00 – 00:30 Compton chicane tuning
· 00:30 – 01:00 Establish beam and quality check
· 01:00 – 09:00 Production with 2-pass beam: 5.5uA
· 09:00 – 09:45 DAQ crash after the attempts of turning on BigBite scintillator and wire chamber HV. Turned them off and the problem is gone.
· 09:45 – 10:30 Production with 2-pass beam: 5.5uA
· 10:30 – 11:00 DAQ problem, caused by a logging onto a incorrect machine. Ask MCC to tune the beam position while solving DAQ problem
· 11:00 MCC raster screw up happened! Extreme large raster caused the beam hitting the wall of 3He cell. Excessive radiation tripped neutron detector and possibly R-HRS VDC HV.
· 11:00 R-HRS VDC bottom chamber HV tripped, searching for experts to fix it while Jack is on vacation.
· 11:00 – 11:55 Establish beam and quality check
· 11:55 – 15:15 Production with 2-pass beam: 5.5uA and without R-HRC VDC#1
· 15:15 – 15:50 BigBite scintillator and wire chamber test
· 15:50 – 18:30 Controlled access: Fix R-HRS VDC#1 HV by switching to local mode and it is only a tempera work around!
· 18:30 – 19:15 Establish beam and quality check
· 19:15 – 24:00 Production with 2-pass beam: 5.5uA