    Saturday, May 9, 2009

     

    ABU

    BANU

    BNA

    Owl

    6.21

    1.22

    0.58

    Day

    2.38

    2.03

    3.59

    Swing

    4.04

    1.39

    2.55

    Total

    14.69

    2.35

    6.93

    ·         00:00 – 00:30 Compton chicane tuning

    ·         00:30 – 01:00 Establish beam and quality check

    ·         01:00 – 09:00 Production with 2-pass beam: 5.5uA

    ·         09:00 – 09:45 DAQ crash after the attempts of turning on BigBite scintillator and wire chamber HV. Turned them off and the problem is gone.

    ·         09:45 – 10:30 Production with 2-pass beam: 5.5uA

    ·         10:30 – 11:00 DAQ problem, caused by a logging onto a incorrect machine. Ask MCC to tune the beam position while solving DAQ problem

    ·         11:00 MCC raster screw up happened! Extreme large raster caused the beam hitting the wall of 3He cell. Excessive radiation tripped neutron detector and possibly R-HRS VDC HV.

    ·         11:00 R-HRS VDC bottom chamber HV tripped, searching for experts to fix it while Jack is on vacation.

    ·         11:00 – 11:55 Establish beam and quality check

    ·         11:55 – 15:15 Production with 2-pass beam: 5.5uA and without R-HRC VDC#1

    ·         15:15 – 15:50 BigBite scintillator and wire chamber test

    ·         15:50 – 18:30 Controlled access: Fix R-HRS VDC#1 HV by switching to local mode and it is only a tempera work around!

    ·         18:30 – 19:15 Establish beam and quality check

    ·         19:15 – 24:00 Production with 2-pass beam: 5.5uA