00:28---Continue production running.
2060 20967 2061 20968 2062 20969
02:11---Stopped Compton run 16874. Started Compton run 16875 Runs (2062, 20969) are continuing.
02:40---Ended runs (2062, 20969). Miha is setting up the BB HV. Changed prescales on L-HRS.
02:53---Started BB test runs
2063 20970
03:20---Reset the prescales back to production running. The BB HV are still on. Resume production running.
2064 20971 2065 20972
04:47---Stopped Compton run 16875. Started Compton run 16876.
Stopped HAPPEX run 31354. Started HAPPEX run 31355.
The BB HV are on, but prescales are those for production. Continue production running.
2066 20973
04:53---RF problem. Recovered at 05:07.
05:44---Miha is changing BB HV configuration. The BB DC HV is off, E & dE HV is on. Changed the prescales for L-HRS.
05:50---Started BB test runs
2067 20974
06:12---The BB E & dE HV are on, but prescales are those for production. Continue production running.
2068 20975
06:45---Stopped Compton run 16876. Trouble starting runs 16877 and 16878. Did "coda reboot" on Compton DAQ. Started Compton run 16879.
06:58---Continue production data collection. Miha is adjusting the thresholds of the BB TDCs at the start of the first run.
2069 20976 2070 20977
Shift ends with production runs (2070, 20977) in progress.