    User name adaq

    Log entry time 08:13:08 on May 11, 2009

    Entry number 272517

    keyword=Beam Time Accounting
    Hall A

    05/11/09 0000-0800
    Experiment #: E05-015
    Shift Leader: A. Tobias
    Shift Workers: R. Michaels (TO), J. St. John (3rd)

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0.000.000.000.000.000.000.430.571.00
    Beam Available
    but Not in Use
    0.000.000.000.000.000.160.270.320.75
    Beam Not Available
    or Unacceptable
    1.001.001.001.001.000.840.320.116.27
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    1.001.001.001.001.001.001.000.687.68
    Planned Config-
    uration Change
    0.000.000.000.000.000.000.000.000.00
    Unplanned
    Experiment Down
    0.000.000.000.000.000.000.000.320.32
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.320.32
    HALL_OFF0.000.000.000.000.000.000.000.000.00
    Bbite0.000.000.000.000.000.000.000.000.00

    Comments: At beginning of shift, accelerator operations is still recovering from 10:30PM East ARC Power Failure during Swing Shift. Beam back by 6:00AM. Once we got 5.5microamp beam on 3He target, neutron arm HV channels and RHRS VDCs tripped. After recovering neutron arm HVs, we start production on 3He with 4x4mm raster and 5.5uamp (we did not ask for access to manually reset RHRS VDCs in the Hall).

    Data Entry by: A. Tobias