• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name miham

    Log entry time 13:09:42 on May 14, 2009

    Entry number 273312

    This entry is a followup to: 272781

    Followups:

    keyword=Corrected the T2 and T5 in the HRS-L

    Today during the access I went up into the HRS-L and into
    the BB "electronics cube" and compared the positions of the 
    cables in the 4616 Module. I realized that signal cables
    on the BigBite side were swapped. I have changed the positions
    of the cables as they should be:
    
    Trigger  |   HRS-L (input)   |   BB-old (inp.)   | BB Corrected (inp.)
    --------------------------------------------------------------------
       T1    |      8            |      8            |      8
       T2    |      9            |      13           |      9
       T5    |      13           |      9            |      13
       T6    |      11           |      11           |      11
    
    I have also changed back the scaler.map file, so that scalers
    are showing correctly in the HRS-L scaler gui. I have saved
    the old file as scaler_14May09.map
    


    A copy of this log entry has been emailed to: vasulk, moffit



    HRS-L scalers



    BB scalers