Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Franklin
Log entry time 12:33:30 on May 19, 2009
Entry number 274774
keyword=FADC VME crate modification
The 2nd VME scaler unit is now cleared by a NIM signal at the same time
of the FADC start. The 20 MHz clock still goes into channel 3 and the
GSO trigger is now copied to channel 6 of both scalers.
This occurred during Compton Run 16967
A copy of this log entry has been emailed to: dparno@cmu.edu,rom@jlab.org