NEXT
Make New Entry,
Make Followup Entry
User name S. Sirca
Log entry time 00:03:49 on June 3,2009
Entry number 278579
keyword=Swing shift SUMMARY
Day shift summary: S. Sirca (SL), A. Shahinyan (TO), H. Lu (3rd)
================================================================
EVENTS
------
16:03 target to polarized He3
16:05-16:15 finish checkout after beam recovery
16:48 start series of He3 elastic runs: #3112 is first decent one
22:50 target to N2 reference cell
23:30 target to D2 reference cell
RUNS-L/BB
---------
#3107 spot++ check on polarized He3
#3108 junk
#3109 junk
#3110 He3 elastic with ps3=1 ps4=2, 5uA
#3111 He3 elastic with ps3=2 ps4=2, 7uA, increased to 8uA during run
#3112 He3 elastic with ps3=2 ps4=2, 10uA, good for analysis, 4.0M
#3113 He3 elastic, 4.0M
#3114 He3 elastic, 4.0M
#3115 He3 elastic, 4.0M
#3116 He3 elastic, 4.0M
#3117 He3 elastic, 4.0M
#3118 junk, zero counts because Left-HRS CODA died
#3119 He3 elastic, 4.0M
#3120 He3 elastic, 4.0M
#3121 He3 elastic, 4.0M
#3122 N2 elastic
#3123 N2 elastic, shorter but OK
RUNS-R/ND
---------
#21979-21984 test runs
#21985 He3 production with 10uA, 0.7M
#21986 He3 production, 3.0M
#21987 He3 production, 3.0M
#21988 He3 production, 3.0M
#21989 He3 production, 3.0M
#21990 He3 production, 3.0M
#21991 He3 production, 3.0M
#21992 He3 production, 5.5M, long run because HRSL CODA did not stop
#21993 He3 production, 3.0M
#21994 He3 production, 3.0M
#21995 He3 production, 3.0M
#21996 came with N2 elastic on left arm
#21997 came with N2 elastic on left arm