Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name ellie
Log entry time 16:08:54 on June 03, 2009
Entry number 278745
keyword=Day Shift Summary
06/03/09 Day Shift Summary
On shift:
SL: Ellie Long
TO: Joe Katich
3rd: John R.M. Annand
· 08:00 Good morning, Hall A! Starting shift in Production
mode with Runs 3138 and 22011.
· 09:35 MCC called, they are taking beam away for a few
minutes.
· 09:41 Beam has returned.
· 09:46 Just kidding. MCC took beam away again. This time
so they can do optics on it.
· 11:00 Beam has been restored, back to Production data
taking.
· 11:26 Looking at replay for the RHRS run after beam
returns (22015), notice there are a lot of missing channels. Details can
be found here.
· 14:55 Changed cell to D2. During cell change
we took a pedestal run (3149 and 22021).
· 15:08 MCC called. Beam down due to magnet problems.
· 15:27 MCC called, they are returning beam.
· 15:37 Beam has been restored.
· 16:06 Ended D2 runs and purging cell. The
shift ends on this note. Good luck, Simon!
Production Runs:
LHRS Run # | RHRS Run
# | Beam
Current | Target
Type | # of LHRS
Events | # of RHRS Events |
3138 | 22011 | 9uA | Pol.3He | 4.0M | 2.7M |
3139 | 22012 | 9uA | Pol.3He | 4.0M | 2.8M |
3140 | 22013 | 9uA | Pol.3He | 1.7M | 1.2M |
3141 | 22014 | 9uA | Pol.3He | 252k | 181k |
3142 | 22015 | 9uA | Pol.3He | 4.0M | 2.9M |
3143 | 22016 | 9uA | Pol.3He | 4.0M | 2.8M |
3144 | 22017 | 9uA | Pol.3He | 4.0M | 2.8M |
3145 | 22018 | 9uA | Pol.3He | 4.0M | 2.8M |
3146 | 22019 | 9uA | Pol.3He | 4.0M | 2.9M |
3147 | 22020 | 9uA | Pol.3He | 4.0M | 2.8M |
3150 | 22022 | 9uA | D2 | 207k | 164k |
3151 | 22023 | 9uA | D2 | 1.5M | 1.1M |
Junk Runs:
LHRS Run # | RHRS Run
# |
3148 | |
Pedestal Runs:
LHRS Run # | RHRS Run
# |
3149 | 22021 |