    06/03/09 Day Shift Summary

    On shift:
    SL: Ellie Long
    TO: Joe Katich
    3rd: John R.M. Annand

    · 08:00 Good morning, Hall A! Starting shift in Production mode with Runs 3138 and 22011.

    · 09:35 MCC called, they are taking beam away for a few minutes.

    · 09:41 Beam has returned.

    · 09:46 Just kidding. MCC took beam away again. This time so they can do optics on it.

    · 11:00 Beam has been restored, back to Production data taking.

    · 11:26 Looking at replay for the RHRS run after beam returns (22015), notice there are a lot of missing channels. Details can be found here.

    · 14:55 Changed cell to D2. During cell change we took a pedestal run (3149 and 22021).

    · 15:08 MCC called. Beam down due to magnet problems.

    · 15:27 MCC called, they are returning beam.

    · 15:37 Beam has been restored.

    · 16:06 Ended D2 runs and purging cell. The shift ends on this note. Good luck, Simon!



    Production Runs:
     LHRS Run #  RHRS Run #  Beam Current  Target Type  # of LHRS Events  # of RHRS Events 
    3138220119uAPol.3He4.0M2.7M
    3139220129uAPol.3He4.0M2.8M
    3140220139uAPol.3He1.7M1.2M
    3141220149uAPol.3He252k181k
    3142220159uAPol.3He4.0M2.9M
    3143220169uAPol.3He4.0M2.8M
    3144220179uAPol.3He4.0M2.8M
    3145220189uAPol.3He4.0M2.8M
    3146220199uAPol.3He4.0M2.9M
    3147220209uAPol.3He4.0M2.8M
    3150220229uAD2207k164k
    3151220239uAD21.5M1.1M



    Junk Runs:
     LHRS Run #  RHRS Run # 
    3148



    Pedestal Runs:
     LHRS Run #  RHRS Run # 
    314922021