• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Bo

    Log entry time 08:29:05 on June 05, 2009

    Entry number 279095

    This entry is a followup to: 279088

    keyword=Re:1/2 wave plate entries wrong?

    In fact, 1/2 half wave was moved out by the injector group at noon yesterday during the beam studies. They forgot to put it back after the beam studies. So from the swing shift on Thursday, all the data are with 1/2 wave plate out. As for the start-of-run script, it read what was input by the shift taker at the start of a run. Since no one changed it from last swing shift, this was why they were inconsistent.

    A copy of this log entry has been emailed to: doug, sirca