Summary of Pion-Test-Run Activity: ---------------------------------- Production run-date: June 11, 2009 RHRS dipole ramping down duration from 1.865 GeV/c to 0.7 GeV/c: 00:00 - 03:00 [3 hrs] Production duration: 03:00 - 08:20 [4 hrs and 20 min] Lef HRS production data of the host experiment uninterrupted. Beam energy=2.42552 GeV [LHRS angle= 12.5 deg] RHRS angle= 18 deg RHRS momentum=0.7 GeV/c Half-wave-plate IN Target polarization mode: LongitudinalRHRS runs Happex runs Target (Target Polarization) Prescale factor (T1/T2/T3/T4/T5/T6/T7/T8) --------- ----------- ---------------------------- ----------------------------------------
22338 N/A Pol. 3He (60.3627%) 1/6/1/36/87/10/1000/65535 22339 31512 Pol. 3He (60.3627%) 1/6/1/36/87/10/1000/65535 22340-22342 31512 Pol. 3He (61.5964%) 1/6/1/36/87/10/1000/65535 22343-22344 31512 Pol. 3He (61.5964%) 1/10/1/10/20/10/1000/100 22345-22346 31513 Pol. 3He (61.5964%) 1/10/1/10/20/10/1000/100 22347 31514 Pol. 3He (62.5654%) 1/10/1/10/20/10/1000/100
There was a typo on halog entry 280545 for the RHRS run written as 22399 for 22339.