    User name H. Gao

    Log entry time 17:14:10 on June12,2009

    Entry number 280811

    keyword=day shift summary

    8:00 am, Start changing the momentum of Left and Right HRS to 3.0855 GeV/c
    8:33 am NMR measurement. P=64%
    8:33 Hall A goes to controlled access.
    9:55 called MCC to go to beam permit
    10:35 set left-arm to 3.35 GeV/c, right arm to 3.0855 GeV/c
    10:45 Jack needs to go down the hall to reset the HV crates. Called for controlled access
    12:05 Jack is done with controlled access. Called MCC for berm permit.
    14:30 MM is about to put beam into the hall
    ~16:00 MCC started to put beam into the hall