• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name miham

    Log entry time 01:43:35 on June13,2009

    Entry number 280915

    keyword=Multiple trips in ND, BB and HRS-R VDC

    When they were bringing the beam back, they tripped multiple channels
    in BB and ND. They also tripped bottom VDC in right arm (Strange since
    HRS-R dipole is not working.) We brought all tripped channels
    back up. Now everything looks normal again (right image).


    FIGURE 1

    FIGURE 2