• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name gjin

    Log entry time 00:12:40 on June 14, 2009

    Entry number 281148

    Followups:

    keyword=swing shift summary

    Shift Crew ============================================================= SL: Yi Qiang TO: Ge Jin 3rd: Andrew Puckett

    Shift Events ============================================================= 16:00 Continue 3He production with half-wave plate OUT 18:55 NMR: 62.25% 21:00 New Happex Run: 31527 21:00 Change ND V-22L HV to -1150V, no help with the ADC/TDC problem 21:30 Change ND V-22L HV back to -1250V 21:55:change ND V-22L HV to -1300V 10:20:MCC stopped the beam

    Run Summary ============================================================= -- Happex Run 31526 -- 3556/22411 3He Production 4M/1.03M 3557/22412 3He Production 4M/1.03M 3558/22413 3He Production 4M/1.03M 3559/22414 3He Production 4M/1.03M 3560/22415 3He Production 4M/1.03M 3561/22416 Junk due to CODA crash 3562/22417 3He Production 4M/1.03M 3563/22418 3He Production 4M/1.03M 3564/22419 3He Production 4M/1.03M 3565/22420 3He Production 2.57M/661k stopped earlier by EB1 crash

    -- Happex Run 31527 -- 3566/22421 3He Production 4M/1.03M 3567/22422 3He Production 4M/1.03M 3568/22423 3He Production 4M/1.03M 3569/22424 3He Production 2.7M/.69M stopped b/c MCC stopped beam