    keyword=3He cell/Ref cell/Target Ladder removed, Parity target installed

    We (Yi^2) removed the reference cell, target ladder and 3He cell attached to the oven and the target cell pickup coils. The 3He cell and reference cell were put into separated boxes and left in the Hall for later RadCon inspection.

    Then we attached the single carbon foil for parity test to the oven. By moving the target ladder to the "optics" position, the carbon foil is perfectly aligned to the beam line. Then we adjusted the coil jets heads, so we now have 3 jets blowing to the beam entrance window, 1 jet blowing to the carbon foil and 2 jets blowing to the beam exit window. We also attached 4 RTDs to the aluminum frame and 1 to the oven, so we can monitor the target temperature by looking at the original "Target cell temperature" strip chart or the EPICS target "RTD Readback" GUI.

    All the reference cell gas bottles: 3He/D2/H2/N2 are closed as well.

    More photos for the new target will be posted later today... keep tuned.