    User name Bob/Kai/Ramesh

    Log entry time 08:39:19 on August20,2009

    Entry number 285012

    keyword=PVDIS crate timing issue resolved

    Bob, Kai, Ramesh ...
    
    We do a few runs changing integration time in Green Monster
    to check the PVDIS scalers.  Recall, one bit is 2.5 usec.
    
    Run ..... Integ. Time ..... Result
    11451 .... 12000 ....... scalers good
    11452 .... 13000 ....... scalers good
    11453 .... 13300 ....... scalers fail intermittently (*)
    11454 .... 13200 ....... scalers good
    11455 .... 13300 ....... fail
    11456 .... 13200 ....... good
    
    (*) The scaler failure means that there is not exactly 1 event
    in the FIFO.  Could be zero or 2, etc.  This is because of wrong
    timing, see fig 1.  This has been understood on a scope.  
    
    The bottom line is we need the integ time to be not more than
    13200 in Green Monster !
    


    FIGURE 1