• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name O.Glamazdin

    Log entry time 23:59:43 on August 27, 2009

    Entry number 286377

    keyword=Moller result

    Moller results on August 28 15:30-17:30


    Preliminary result (will be corrected on the beam energy fluctuation)
     #     beam     runs target Ptarget% Pbeam% comments
    1 0.6 µA 13416-13419 5 8.03 -80.76±0.3±2.0
    2 0.6 µA 13421-13427 5 8.03 -79.18±0.3±2.0
    3 0.6 µA 13428 5 8.03 -79.41±0.3±2.0
    4 0.6 µA Average 5 8.03 -79.85±0.2±2.0
    5 0.5 µA 13429-13433 4 7.51 -78.10±0.2±2.0
    6 0.5 µA 13434-13438 4 7.51 -78.01±0.3±2.0
    7 0.5 µA 13439-13440 4 7.51 -78.04±0.3±2.0
    8 0.5 µA Average 4 7.51 -78.10±0.2±2.0
    - - Average 4-5 - -78.95±0.12±2.0 Targets 4 and 5



    A copy of this log entry has been emailed to: gen@jlab.org



    Figure 1 Beam energy fluctuation