Shift Summary:
----------------------------------------------------------------
00:00 - S0 tuned on, Happex Left detector HV set to 1900V. Testing new base(H3) on the PMT, count rate etc...(Rupesh)
00:20 - S0 turned off, HAPPEX detector back to 1600V
00:35 - Asked for 3.5x3.5 (7.7x6) rater size and 50uA.
01:10 - 0.5uA to take R_HRS run with S0 turned on.
01:30 - Asked MCC for 70uA for production
03:30 - MCC have problem delivering beam. Sending beam to Hall-A dump.
03:40 - beam back.
05:56 - Asked to turn off the beam for detector linearity test on RHRS.
06:25 - Done linearity tests. Back to production.
06:40 - R-HRS detector saturating. Beam turned off to debug.
07:24 - Crate re-boot,fixed pedestal to R-HRS ADC, back to production.
Run Summary
--------------------------------------------------------------
Time Run# I(uA) Comment
--------------------------------------------------------------
00:40 11860 50 10k , Lumi HV setting was for 100uA
00:50 11861 50 Lumi HV adjsuted for 50uA
01:02 11862 60 Lumi HV back to 60uA/70uA setting
01:41 11863 70 100k raster 5x4.5, production.
02:42 11864 70 junk
02:43 11865 70 85k
03:38 11866 70 100k
04:34 11867 70 100k
05:31 11868 70 32k, LED was turned on at ev_num=31500
05:56 11869 0 Detector linearity test
06:10 11870 0 "
06:25 11871 70 RHRS detector saturating.. junk!
07:10 11872 0 linearity test
07:24 11873 70 production
-------------------------------------------------------------