Log entry time 16:20:02 on September 2,2009
Entry number 287525
keyword=Shift Summary
Shift Summary
-------------
During this shift MCC was able to deliver us 100 uA. We then went to the cryo-target and with some help from cryo we were able to run at full current. The inlet temperature needs to be monitored.
During the shift we did a boiling study and ended the shift running the parity DAQ 11889.