Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name silwal
Log entry time 23:20:11 on September 5,2009
Entry number 288186
Followups:
keyword=HallA FFB RF turn on problem
MCC has not been able to turn on the energy FFB on since the end of Moller measurements. For now it is either beam or FFB on( which trips the beam!).
FIGURE 1