Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jpchen
Log entry time 00:03:18 on September11,2009
Entry number 289039
keyword=swing shift summary
Swing shift summary:
Shift workers: J. P. Chen (SL), N. Muangma(TO), A. Glamazdin (3rd)
16:00 scheduled down, hall in controlled access.
19:30 all people out of hall. requested for beam permit.
Will be at least another hour before tuning beam to Hall A.
21:40 Left Q1 tripped due to dropping in He level (<10% --> 0%).
22:00 Right Q3 tripped due to He level. Q1 He level also went to red.
We set Right Q1 current to 0.
22:10 Right Q1/Q3 level back to normal. But Left Q1 level still 0.
22:15 Talked to Heidi, will need to reset in the hall for right Q3, Q1 can be reset from the counting house.
22:30-22:45 MCC wanted to put us in beam permit for beam tuning. So went to the hall, reset Q3, succeeded after a fwe tries.
22:45 Informed MCC to put us in beam permit.
22:55 Hall in beam permit.
23:00 All magnets set, Q3 right cycled.
24:00 still beam tuning