Log entry time 23:54:05 on September 12, 2009
Entry number 289284
keyword=Swing shift summary
Swing shitf summary
Roche, Saenboonruang.
Events of note
- Continued work on the compton
- Inserted HWP around 19:00, started slug 6. flipper settings had to
be set by hand
- no beam between 19:00 - midnight. Trouble in the injector
Time line
- 16:00 data taking in progress while MCC optic and Hall A Compton
peoples are trying to tune the beam some to reduce single rates in the
Compton.
- 17:00 MCC is going to take some harp scans to look at the beam size.
They tweaked some quadrupoles in their COmpton tuning and want to check
the final beam size. End run 12257, go to empty target
- 17:20 MCC repots that the beam size did not change significantly, we
are going back to LH2 target.
- 19:00 Hall B and us are ready to insert the HWP. Just at that time,
MCC reports trouble with the injector. "flipper". Marc Dalton chose to
set the flipper variables by hand and will work on fixing the script later on
- 19:00- to the end of the shift: no beam. The beam was stuck in the
injector.