• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name jroche

    Log entry time 15:16:04 on September13,2009

    Entry number 289355

    keyword=slowly ramping up the beam

    MCC took the beam away around 2pm in order to try to figure out why the beam was tripping so much. They do not think they have found the solution of to the problem but will ramp up the beam slowly to at least try to find the "breaking" point.