• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Sarah

    Log entry time 17:52:21 on September 13, 2009

    Entry number 289369

    keyword=Run Plan for Tonight

    Run Plan

    1. Take production data! Watch the lumi widths to see if anything changes. Please check the histograms on the online data monitor with the reference ones on the shift how-to page (http://hallaweb.jlab.org/experiment/HAPPEX/opmanual/opmanual.html#HPXStartingonlineanalysis).
    2. Take Compton data. Alexandre will start looking at the electron detector signals. People will also take a look at the Compton data from this morning, where we had both photon and electron data.
    3. Change the half-wave plate state when we get to 1M good pairs. Follow the instructions for doing this and running the flipper script here: http://hallaweb.jlab.org/experiment/HAPPEX/opmanual/opmanual.html#ChangingHalfWavePlate
    4. Run spot++ every couple of hours and log it. Change the prescale factor PS8 to 1 and PS1 and 2 to 99999.
    5. We will be running on 80 muA until 6:00pm, when MCC will take the beam away to do beam checks and get us back to 100 muA. If they are unable to get to 100 muA without tons of beam trips, we will run on 80 muA until the morning as long as it is stable.
    6. Beam Time Accounting: accept the beam unless the Compton people say that they just cannot use it. Then record it as BNA.

    Concerns