    User name R. Michaels

    Log entry time 09:55:35 on September16,2009

    Entry number 289902

    keyword=spot check -- good -- ready for production

    Turn on S0 HV on R-HRS.  Use T2 only.  Run spot_R on run 4604
    with 5 uA on hole C12 target.  See the hole (fig 1).  Spot++ pic
    is wierd (fig 2) and spot_L does not work (I'll check later).
    
    EPICS says the beam is in our canonically good location
    
    IPM1H04A.XPOS                 -0.0586074
    IPM1H04A.YPOS                 1.11495
    IPM1H04B.XPOS                 -0.796723
    IPM1H04B.YPOS                 2.04622
    
    While some diagnostics are funky, the proponderance of evidence
    is that the beam is fine and we are ready for production !
    
    S0 HV turned off again.
    
    Putting in LH2 target.
    
    


    FIGURE 1

    FIGURE 2