    8:00 Hall was in controlled access to fix spot++
    9:15 Dustin came out of the hall.
    9:40 Beam back ...going to production
    10:00 Compton tune is not good
    10:32 Tuning for compton (5uA)
    11:50 Beam off for Compton tune.
    12:00 beam back ..checking raster, target to carbon hole.
    12:50 MCC still struggling to get the positions correct.
    13:15 MCC is having difficulties with tuning beam positions with the new setting( Hall-A quad settings). So they are going back to old settings to deliver beam.
    14:18 MCC took beam away for fixing beam loss problems.
    15:35 Right arm Q2 quenched. Asked for controlled acess.
    15:55 Q2 is back, remote reset worked.


    Run Summary
    ===========================
    Run current comments
    ---------------------------
    12380 100uA last 1min was 5uA
    12381 5uA compton tuning
    12382 100uA
    12383 " charge feedback turned on (short run)