User name Kalyan
Log entry time 16:04:17 on September16,2009
Entry number 289972
keyword=Shift summary / Run summary
8:00 Hall was in controlled access to fix spot++
9:15 Dustin came out of the hall.
9:40 Beam back ...going to production
10:00 Compton tune is not good
10:32 Tuning for compton (5uA)
11:50 Beam off for Compton tune.
12:00 beam back ..checking raster, target to carbon hole.
12:50 MCC still struggling to get the positions correct.
13:15 MCC is having difficulties with tuning beam positions with the new setting( Hall-A quad settings). So they are going back to old settings to deliver beam.
14:18 MCC took beam away for fixing beam loss problems.
15:35 Right arm Q2 quenched. Asked for controlled acess.
15:55 Q2 is back, remote reset worked.
Run Summary
===========================
Run current comments
---------------------------
12380 100uA last 1min was 5uA
12381 5uA compton tuning
12382 100uA
12383 " charge feedback turned on (short run)