• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Sarah

    Log entry time 17:37:05 on September 16, 2009

    Entry number 289981

    keyword=The Run Plan for Tonight and Tomorrow

    Run Plan

    1. When beam comes back tonight, do our beam diagnostics to make sure that everything is good (the optimal values for the raster, beam position, beam current, lumi RMS, and detector asymmetry RMS are on the whiteboard).

    2. Take production data! Watch the lumi widths to see if anything changes. Please check the histograms on the online data monitor with the reference ones on the shift how-to page (http://hallaweb.jlab.org/experiment/HAPPEX/opmanual/opmanual.html#HPXStartingonlineanalysis).

    3. Take Compton data! You will need to start a new Compton run every two hours. The CODA screen to start and stop the Compton runs is in the back room.

    4. Change the half-wave plate state when we get to 1M good pairs. Follow the instructions for doing this and running the flipper script here: http://hallaweb.jlab.org/experiment/HAPPEX/opmanual/opmanual.html#ChangingHalfWavePlate

    5. Run spot++ every couple of hours and log it. Change the prescale factor PS8 to 1 and PS1 and 2 to 99999.

    6. When we go back to production and things are somewhat stable, if our lumi widths are up into the 1300-1500 range, go down to 95 or 90 muA and take data for at least 30 minutes so that we can study the target boiling. Don't go below 100 muA unless you see the lumi widths go up to this range at 100 muA.

    7. We are planning to have a Moller measurement tomorrow (the time is still to be determined).

    8. Q2 quenched earlier today, and Ed came in and asked that we keep an eye on it.

    9. We are really behind in our data goals at this point. Please do not be shy about calling in the expert on something if it is holding things up.


    Concerns