    Log entry time 21:01:15 on September 17, 2009

    Entry number 290203

    keyword=Position Scan Run Plan

    Position Scan Run Plan

    The point of this scan is to make sure that we are not hitting the aluminum with the beam. This should take 2 - 3 hours.
    1. Start at nominal run position, centered on the C-hole target.
    2. Try to get raster to 6 x 6 mm.
    3. Then:
    4. Take 15000 Good pairs at ~95 uA.
    5. Repeat steps 1) and 2) at each of 4 positions, +/-1 mm in x, +/-1mm in y from nominal.