    User name Nuruzzaman

    Log entry time 16:00:45 on September18,2009

    Entry number 290378

    keyword=Day Shift Summary

    08.35 HAPPEX CODA lost connection, restarted
    08.40 Parity run 12451 statred @ 100uA target H2
    09.05 HV channel tripped, reset. Lost Lecroy screen, brought it back
    09.37 Parity run 12451 statred @ 100uA target H2
    10.50 HAPPEX CODA lost connection, restarted several times
    10.54 CODA didn't work with config. "happex3", changed to "HapNoQweak"
    10.55 Parity run 12456 statred @ 100uA target H2
    11.50 MCC is down to their IOC reboot
    12.02 Beam is back with 20uA
    12.18 Now current is back to 100uA
    12.18 Did spot++ for H2 targt. with 100uA, LHRS run 24760
    12.21 Parity run 12457 statred @ 100uA target H2
    12.33 Too many bem trips during last hour
    13.18 Parity run 12458 statred @ 100uA target H2
    14.14 Parity run 12459 statred @ 100uA target H2
    14.18 Target IOC rebooted, due to HP heater problem for LH2 
    14.45 Lost HallA Tool screen, brought it back
    15.12 Did spot++ for H2 targt. with 100uA, LHRS run 24761
    15.15 Parity run 12460 statred @ 100uA target H2
    15.16 FSD triped for 10 mnts.
    15.27 Beam is back @ 100uA
    
    
    Comment: For every beam trip target Loop 3 temp. goes below 18K.
    	 Mysterious High Voltage trips several time during shift.
    	 Overall a nice shift with reasonably good production data.