Log entry time 16:00:45 on September18,2009
Entry number 290378
keyword=Day Shift Summary
08.35 HAPPEX CODA lost connection, restarted
08.40 Parity run 12451 statred @ 100uA target H2
09.05 HV channel tripped, reset. Lost Lecroy screen, brought it back
09.37 Parity run 12451 statred @ 100uA target H2
10.50 HAPPEX CODA lost connection, restarted several times
10.54 CODA didn't work with config. "happex3", changed to "HapNoQweak"
10.55 Parity run 12456 statred @ 100uA target H2
11.50 MCC is down to their IOC reboot
12.02 Beam is back with 20uA
12.18 Now current is back to 100uA
12.18 Did spot++ for H2 targt. with 100uA, LHRS run 24760
12.21 Parity run 12457 statred @ 100uA target H2
12.33 Too many bem trips during last hour
13.18 Parity run 12458 statred @ 100uA target H2
14.14 Parity run 12459 statred @ 100uA target H2
14.18 Target IOC rebooted, due to HP heater problem for LH2
14.45 Lost HallA Tool screen, brought it back
15.12 Did spot++ for H2 targt. with 100uA, LHRS run 24761
15.15 Parity run 12460 statred @ 100uA target H2
15.16 FSD triped for 10 mnts.
15.27 Beam is back @ 100uA
Comment: For every beam trip target Loop 3 temp. goes below 18K.
Mysterious High Voltage trips several time during shift.
Overall a nice shift with reasonably good production data.