Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name paschke
Log entry time 23:59:38 on September18,2009
Entry number 290439
keyword=Swing Shift Summary
16:13 parity run 12461 started at 100uA target H2
17:15 did the spot++ for H2 target at 100uA, LHRS run 24762
17:16 parity run 12462 started at 100uA taget H2
17:26 parity run 12463 started at 100uA target H2
18:20 Compton computer has crashed
18:25 parity run 12464 started at 100uA target H2
19:12 run 12464 crashed
19:13 parity run 12465 started at 100uA target H2
19:20 Compton HV tripped, turning it off and back on fixed the problem
19:40 Compton HV tripped, resetting the voltage fixed the problem
20:15 did the spot++ for H2 target at 100uA, LHRS run 24763
19:13 parity run 12466 started at 100uA target H2
21:13 parity run 12467 started at 100uA target H2
21:29 Compton HV tripped, resetting the voltage fixed the problem
parity run 12486, at 100uA target H2.
22:15 Moller quads tripped! MCC reseting and cycling.
22:19 Moller quads not resetting. MCC calling magnet expert. Actually, ops can't find reset buttons for the power supplies, since the controls for this system are different than the norm.
22:27 Magnet expert on the way in (20-25 minutes). Access probably needed.
23:40 Access to reset Moller quads. Beam back after MCC cycles quads and checks out beamline. spot++ check, then back to LH2.
parity run 12471- tune mode and other junk.
23:55 We're back to production! WOO-HOO!!!
parity run 12470, production at 100uA on LH2