    User name jpchen

    Log entry time 16:01:50 on September28,2009

    Entry number 292076

    keyword=Day shift summary

    Day shift summary:

    Shift workers: J. P. Chen (SL), R. Michaels (TO), N. Muangma (3rd).

    smooth running all shift.
    8:00 production,
    The target temperature fluctuats during the previous shift.
    Adjusted JT valve to keep target HP heater be non-zero with full beam current, which keeps the target at constant temperature of 19 K.
    13:05 Compton HV tripped and reset.
    13:15-13:20 did spot++ (run24925), size 6x5, ok.
    16:00 still production

    run information, 97uA on LH2.

    12754 7:15-8:20, 100K
    12755 8:21-9:09, 100K
    12756 9:09-10:06 100K
    12757 10:07-11:07,100K
    12758 11:07-12:04, 100K
    12759 12:04-13:00, 100K
    12760 13:01-13:58, 100K
    12761 13:58-14:55, 100K
    12762 14:55-15:52, 100K
    12763 15:53- still going at shift end.