    User name ZAFAR AHMED

    Log entry time 08:01:58 on November 6,2009

    Entry number 297762

    keyword=Owl shift summary

    12:00 start of shift

    03:00 From 12 am to 3 am MCC was tuning the beam.

    03:00 approximately around this time, left arm Q1 and dipole and right arm Q1 went down. Not sure what happened

    03:30 Bob reset the left arm Q1 from the middle room. Left arm Q1 and dipole starts to ramp up.

    04:04 Turned on VDC HV to do the Q square measurement

    04:30 Turned off VDC HV for boiling test.

    Boiling test