    User name M Friend

    Log entry time 08:03:00 on November12,2009

    Entry number 299163

    keyword=Owl shift summary

    00:03 Requested an escorted access to fix a DAQ problem and add a filter to the 
    Compton photon beamline.
    
    00:54 Hall out of controlled access.
    
    1:05 Back to 100uA beam and production running.
    
    1:49 Target low pressure alarm with beam trip.
    
    Lots of beam trips.
    
    3:47 Requested 97uA beam to hopefully reduce the large number of beam trips. 
    
    3:58 MCC is having an RF zone problem and will take beam away for a little 
    while.
    
    4:25 MCC is ready to give us beam again.  Requested 2uA for spot++ and then 
    100uA.  However there have been many beam trips.
    
    4:44 MCC is having an orbit problem and will take beam away.
    
    4:54 MCC has fixed the orbit problem and will send beam again.
    
    7:24 Request 2uA for short test run to check out PID problem.
    
    7:37 Request 100uA for production running.
    
    7:43 BPM12 was saturating.  Called MCC and it was fixed.
    
    7:50 Run stopped to start Moller measurements
    
    7:52 BPM12 seems to be saturated again; we will fix the problem after Moller 
    measurements
    
    8:00 Target moved to empty position
    
    There were several gas shed airflow alarms during this shift, none of which 
    lasted longer than about 15 seconds.  Could be due to gusts of wind.
    
    Production runs (PVDIS/LHRS/RHRS):
    13885/25395/4945
    13886/25396/4946
    13887/25397/4947
    13888/25398/4950 - not much beam - mostly a pedestal run
    13889/25399/4951
    13890/25400/4952
    13891/25401/4953
    13892/25403/4955 - 2uA, 10 minute run
    13894/25405/4957 - Run sotpped for Moller measurements