Log entry time 16:07:47 on November18,2009
Entry number 300799
keyword=shift summary
run is smooth but HRS-R Q2 is down
8:10 beam up to 100 \mu A
8:15 beam up to 104 \mu A
8:55 beam OFF for high beam preparation
9:00 lost HRS-l Q1 - helium level is down
9:05 helium level back above 50%
9:15 target on empty position, MCC send beam as large as 120
9:40 MCC completed study, hall in control access
run flipper - incremented slug number - become 5
call MCC, they put IHWP out
run flipper again without incrementing slug number
Now log entry and status are consistent.
12:25 tech completed work in the Hall
HRS-L Q1 is ramping up
13:00 HRS-L Q1 trips, Jack is going back to the Hall
15:00 Jack is adusting Q1 cryo flow
15:20 beak back, check on BeO is OK, harp scan is OK,
raster 6x6 (MCC) and 2 muA beam ok holey carbon is OK.
DAQ run for spot++ check is OK.