• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name ZAFAR AHMED

    Log entry time 17:36:19 on December 02, 2009

    Entry number 304198

    Followups:

    keyword=Cavity Pregains Reduced by 1

    During the parity run 14377 around 17:30 I reduced the current and position pregains of both cavity monitors by one.

    Upstream Cavity(3HO2):

    C pre gain: From 4 to 3 X pre gain: From 2 to 1 Y pre gain: From 2 to 1

    Downstream Cavity(3HO3):

    C pre gain: From 4 to 3 X pre gain: From 1 to 0 Y pre gain: From 1 to 0



    A copy of this log entry has been emailed to: rom, musson, deng



    Figure 1



    Figure 2



    Figure 3



    Figure 4