Run Coordinator's Report for Wednesday December 9 Day through
Thursday 10 Owl
Summary
- There is an open day shift on Monday, December 14, 2009, and a few
open shifts 18-22 December.
Please sign up!
- We collected Q^2 and parity data with the RHRS Q3 magnet turned off.
See
HALog 305884
for a
summary, and HALog 305814
for some analysis of this data.
- During the day yesterday, a Mott measurement was done to measure the
vertical polarization component of
the beam. The measured vertical polarization component was
consistent with zero. See
HALog 305822
for a summary.
- We achieved 8 hours of ABU in the last 24 hrs. Slug 21 was begun
at 9am on 9 December.
Run Plan
- During day shift, we took Moller data, including the beam
current scan and laser phase studies.
- We are now (swing) taking a set of optics target and aluminum
dummy runs.
- Following the optics target and aluminum dummy runs, we will resume
production running for Slug 21.
Requests
- There is an open day shift on Monday, December 14, 2009, and
several open shifts 18-22 December.
Please sign up!
- Shift Leaders: please write a detailed shift summary
(here
is a great example)
and submit the BTA for each shift.
Please log CODA reboots in the halog and shift summary.
- 3rd person: Please make sure to start and stop the HRS DAQ
at the same time as the parity DAQ and to
do the prompt analysis and the HRS analyzer for every run.
- 3rd person: please keep a careful eye on the online data display.
Most problems can be caught quickly
this way.
- Please make sure that the shift checklist is done once each shift.
Data taken
- Production charge taken in the 24 hours ending Wednesday Owl: 1.3
C
- Total production charge taken in all, end of Wednesday Owl: 66.6
C
Shift Summaries and BTA Reports