    User name miham

    Log entry time 00:06:00 on December 13, 2009

    Entry number 306529

    keyword=SWING Shift Summary (12/12/09)

    Swing shift summary: Miha Mihovilovic (SL), Konrad Aniol(TO),
                         Abdurahim Rakhman (3rd)
    ===================================================================
    
    EVENTS
    ------
    
    16:00   Shift started without beam. MCC still has problem with
            the PS in the Accelerator.
            
    16:30   Asked for a escorted controlled access to the Hall. Alex
            Camsonne wants to do some stuff to the compton. 
            
    16:38   Alex and ARM are going into the Hall.
    
    17:24   MCC called and told us, that they are ready to send beam.
            We also asked Alex to finish with the Contolled acces, so
            that we can bring beam back.
            
    17:33   Alex Camsonne is out of the Hall.
    
    17:34   Asked MCC to return us to Beam permit and Cycle UP the 
            separation magnet.
         
    17:35   Asked MCC to mask the target motion so that we can move to 
            EMPTY and to turn OFF the raster for the HArp scan
            
        
    17:36   Moving target to Empty
    
    17:37   Target is at empty position
    
    17:43   MCC will send 5uA beam
    
    17:49   Harp scan is done. SigmaA (x/y) = 200/200um
            and SigmaB (x/y) = 200/200um. These number are within the 
            limits.
            
    17:49   BPMs are not OK. Asked MCC to correct them
    
    17:50   BPMs now look OK. BPMA (x/y) = -0.73/-0.03 and 
            BPMB (x/y) = -0.70/0.03
            
    17:51   Asked MCC to mask the target motion, we would like to
            go to LD2 target. Also asked MCC to turn on the raster
            to 6x6MCC. We also turned on the VDCs for the low current
            runs.
            
    18:00   VDC chambers are on. Targe is also in place.
    
    18:02   Asked MCC for 2uA beam with raster 6x6MCC.
    
    18:03   Started Q2 runs 26177/5690. T1 rate in left arm is 1.6kHz
            while the T1 rate in right arm is 1.7kHz. The 
            actual current is 1.8uA.
            
    18:12   Q2 runs ended. They both have approx. 0.6M events.
    
    18:12   Turning the VDCs OFF!
    
    18:20   VDCs are OFF!
    
    18:29   Starting Production. Furst production runs are: 
            14593/26178/5691.
    
    19:51   We noticed that Compton DAQ is not counting. It was reporting
            ROC5 error. We did coda reboot and now it works again.        
            The DAQ crashed during run #21575 and it had approx 1M events.
            New run that we started is #21576. 
            
    20:02   During run #14595 we noticed that happex DAQ is not counting.
            We restarted coda, but it did not help. The Download procedure
            stuck while connecting to ROC25. Therefore we killed CODA and
            rebooted all ROCs. Afterwards we started coda again an now it
            seems to be working normally again. We also had to re-start
            the Beam modulation, because when we checked it was off. 
            
    21:09   There was a Compton HV trip. This was probably caused by the
            beam trip somehow. We had to turn the HV off and turned
            it on again. Now seem sot be working fine again. 
            
    22:20   Started new Compton Run #21577. Compton run #21576 has ended
            normaly and had approx 1.2M events.
            
    23:30   We noticed that Compton Cavity is not locking. Abdurahim 
            is trying to fix it.
            
    
    23:45   Abdurahim solved the Compton problem. He also improved the
            cavity power. We have rebooted coda and started a new run.
            21578.
            
            
    23:46   We noticed that Right arm coda is not counting. There is
            a ROC1 problem. We are trying to solve the problem. 
            Experts are trying to connect to it. There seems to 
            be a problem with loading the software to it. Diancheng
            is trying to load the softweare manually. Next shift crew
            will try to solve the problem. 
            
    
    
      
                                   RUN LIST
    ===================================================================
    
    
    
    Right Arm DAQ:
    --------------
    
    5690: 18:00/18:08 - Q2 & W run and spot++ check
    5691: 18:22/19:47 - Production, Longer run
    5692: 19:47/19:58 - Production, Happex DAQ crashed
    5693: 20:15/21:11 - Production
    5694: 21:12/22:09 - Production
    5695: 22:10/23:07 - Production Run
    5696: 23:08/23:46 - Production Run, Roc1 crashed
    
           
    
    Left Arm DAQ:
    --------------
    
    26177: 18:00/18:08 - Q2 & W run and spot++ check
    26178: 18:22/19:47 - Production, Longer run
    26179: 19:47/19:58 - Production, Happex DAQ crashed
    26180: 20:15/21:11 - Production
    26181: 21:12/22:09 - Production
    26182: 22:10/23:07 - Production Run
    26183: 23:08/23:46 - Production Run, Roc1 crashed
    
    
    
    
    
    Happex DAQ:
    -----------
    
    14593: 18:23/19:20 - Production Run
    14594: 19:20/19:47 - Production Run
           (! Runs 14593 and 14594 should be analyzed together
              because we forgot two stop HRS DAQs in between !!)
    14595: 19:47/19:58 - Junk, Coda Crashed
    14596: 20:14/21:11 - Production Run
    14597: 21:12/22:09 - Production Run
    14598: 22:10/23:07 - Production Run
    14599: 23:08/23:46 - Production Run, Roc1 crashed
    					       		      			        
    


    A copy of this log entry has been emailed to: miham