    User name R. Michaels

    Log entry time 06:04:03 on June 4,2010

    Entry number 324429

    keyword=getting into production, part 1

    05:10 ... Access to take out sieves and switch quartz
    to integrating mode.

    05:30 ... Empty target, raster on. septum on.
    Plan to do short beam recovery procedure.

    05:40 ... ACC reports they need to bypass 2 cavities. Problems ...

    05:41 ... Cooler/blower turned on. Note: target vacuum 8.3e-7 Torr.

    06:00 ... Beam returns
    Doing the short beam recovery procedure.

    BPM 4A shows x,y = 0,0
    BPM 4B x,y = 0,1

    spot++ for run 27728 (fig 1). Looks ok.

    06:02 .... Moving to Pb/D #3.



    FIGURE 1