    Log entry time 16:45:33 on June 21, 2010

    Entry number 327908

    keyword=DAQ modifications: run on adaql2 now

    At the present time, both L-HRS and R-HRS DAQ run on adaql2.
    And they both work (as during PREX).
    
    They are still independent and cannot be run simultaneously.
    This is a temporary setup.  
    
    Soon, both HRS will be run from one Trig. Super. (TS) -- the one 
    on the L-HRS.  
    
    If you try to run on adaql3 (old L-HRS) you'll get a gentle warning
    that you cannot.
    
    The DAQ configs are
    
    LeftHRS
    RightHRS
    
    Neither have GEM crates.  All configs with "GEM" in them are removed
    from the CODA database.
    
    Stuff to do:
    
    1. Reconfigure the Fastbus on L-HRS, per Bogdan's spec (to make the
    DAQ faster and provide independent gates for ADCs).  5 or 6 hours
    
    2. Connect the R-HRS DAQ to the TS on L-HRS.  5 or 6 hours
    
    3. Various trigger work -- narrow windows, careful alignment, pulser
    tests, etc.  Not sure, maybe 12 hours.
    
    4. Documentation
    