    User name J. Zhang

    Log entry time 23:29:08 on June30,2010

    Entry number 329239

    keyword=Swing shift summary

    16:00 Shift start without beam. Hall is still under restrict access.
    16:10 Went to MCC to open the Septum control window for them. There will be a beam line test once the hall is closed. MCC are going to control the septum by themselves.
    17:12 Albert and Bob left the hall
    17:15 Called MCC to sweep the hall
    17:30 Went down with Bryan from MCC to sweep the hall
    18:10 Finished Sweeping. Ready for beam permit.
    18:15 MCC started the beam line test
    22:20 Controlled access