    User name Carlos

    Log entry time 05:47:36 on October 03, 2010

    Entry number 333483

    keyword=Owl shift summary

    We started the shift after the Moller commissioning. Getting the beam 
    back to the previous setting took some time, and the quality was poor 
    (very high Compton rates, frequent ion chamber trips). We could not do 
    any work on the Compton.
    
    We did some BPM studies (see related entry). BMPs are still saturating 
    and need some expert look.
    
    We shot some beam on solid targets to see backgrounds on the calorimeter 
    (PMT anode currents in particular). At first look, we don't see any 
    significant values, but since the target is warm we couldn't run any high 
    beam current.
    
    At around 5:30 we turned the beam over to MCC for them to perform some 
    multiharp scans. We'll request controlled access as soon as they are 
    finished.