• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name hisham

    Log entry time 12:15:28 on October 5,2010

    Entry number 333724

    keyword=ADC synch checker cables are installed

    ADC synch checker cables are installed:
    one cable is connected to Crate 3: slot 23: channel 48
    another is connected to Crate 4: slot 24: channel 48
    The other two suppose to go to the ARS (not connected yet)