• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name jpchen

    Log entry time 00:21:12 on October 9,2010

    Entry number 333974

    keyword=cryotarget cooldown complete

    Target cool-down completed: both loops are cold.
    Loop 1: LD2 at 22K, 24.5psi, fan speed at 10% (24 Hz), HP heater power near zero.
    Loop 2: LH2 at 19K, 25 psi. fan speed at 25% (60 Hz), HP heater power ~ 120-130 watts, ready for takking beam (10 uA).


    FIGURE 1