Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jpchen
Log entry time 00:21:12 on October 9,2010
Entry number 333974
keyword=cryotarget cooldown complete
Target cool-down completed: both loops are cold.
Loop 1: LD2 at 22K, 24.5psi, fan speed at 10% (24 Hz), HP heater power near zero.
Loop 2: LH2 at 19K, 25 psi. fan speed at 25% (60 Hz), HP heater power ~ 120-130 watts, ready for takking beam (10 uA).
FIGURE 1