Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Jin Huang
Log entry time 00:01:42 on October 10, 2010
Entry number 334146
keyword=Shift Summary : Oct 09 Swing
Crew
- SL: Jin Huang
- TO: Min Huang
- Analysis: Salvatore Frullani
Time Line
- 1600 Shift started. Status:
Run 7085
Beam: 15uA
Raster: 4x4mm spot++
HRSL: 27.5 degree, 3.427GeV (Elastic +3%)
- 1614 Continue elastic scan @ dp=+3% for two hours
- 1825 Changed LHRS momentum to dp=+0% (3.327GeV/c)
- 2000 There is a glitch on coolant supply, we lost lock of target
temperature although increased JT valve. Stop the beam at worst time, and
recovering it as coolant get stabilized again.
- 2107 Change Cerenkov HV before start of run 7093
- 2220 Changed LHRS momentum to dp=-4% (3.194GeV/c). Went through
lots of troubles. Have to manually set NMR DAC to get it locked. During
the process, Alex was testing PbF2 with running beam.
- 2310 Stop run 7096 due to CODA problem. Alex come to fix it.
Run List
Elastics data, dp=+3% (3.427GeV)
- 7085: 15uA
- 7086, 7087: 10uA
Elastics data, dp=0% (3.327GeV)
- 7088, 7089: 10uA
- 7091, 7092: variable beam current during a coolant glitch
- 7093: 10uA, updated HV
Elastics data, dp=-4% (3.194GeV)
- 7096: 10uA, stopped due to CODA problem
- 7099: 10uA
Test Run
- 7094, 7095: PbF2 test by Alex